Friday, 4 October 2019

1930's Peugeot 401 Engine Machine Work







1. Showing the bearing now roughed and fitted into the crankcase.

2. The flywheel has been balanced. 

3. The rear main showing the housing and oil return collar that will mount on to the crank and run within the housing. This will become a rear datum for machining the main bearings. 

4. Indicating some of the areas where the crank has been balanced.


No comments:

Post a Comment